Working shaft construction methods can be used for pipe jacking operations including:

  • Circular caissons jacking pits
  • Aluminium formworks
  • Sheet Piling
  • Segmental Lining

In some situation, ground treatment or underground water dismantling may be needed to enable the construction of shaft to proceed. These include:

  • Well pointing and deep wells
  • Compressed air
  • Suspension grouts
  • Chemical stabilization
  • Ground freezing